Production Track Balance Analysis Using The Moodie Young Method
DOI:
https://doi.org/10.55227/ijhet.v1i2.19Keywords:
Line Balancing, Moodie Young, Line Efficiency, Balance Delay, Smooth IndexAbstract
The purpose of this study was to find out the efficiency level of the production line by using the Moodie Young method. Where the method was used to determine the balance level of the production line consisted of 3 parts, namely: Line Efficiency, Balance Delay, and Smooth Index.The results showed that in the actual production line arrangement, there were 5 workstations with 7 work elements with Line Efficiency results of 40.29 %, Balance Delay of 59.70%, and Smoothness Index of 9578.22.
Downloads
References
Arman Hakim Nasution, Yudha Prasetyawan. (2008). Perencanaan & Pengendalaian Produksi, Yogyakarta : Graha Ilmu
Casban, L. H. (2016). Analasis Keseimbangan Lintasan Untuk Menciptakan Proses Produksi Pump Packaging System Yang Efisien Di Pt. Bumi Cahaya Unggul. Seminar Nasional Sains Dan Teknologi, 1-12.
Daeng Polewangi, Yudi, Dkk. (2021). Pengantar Teknik Industri, Medan : UMA Press.
Graha Ilmu.Baroto, Teguh. (2002, 2006 & 2013). Perencanaan Dan Pengendalian Produksi. Jakarta: Ghalia Indonesia.
Ginting, Rosnani. (2007). Sistem Produksi. Yogyakarta: Graha Ilmu. Kusuma, H. (2009). Manajemen Produksi Perancangan Dan Pengendalian Produksi.Yogyakarta: Cv Andi Offset.
Merry Siska, R. S. (2012). Analisis Keseimbangan Lintasan Pada Lantai Produksi Cv. Bobo Bakery. Seminar Nasional Teknologi Informasi Komunikasi Dan Industri, 481-488.
Napitupulu, Juni Yanti. (2010). Penyeimbangan Lintasan Pada Proses Pembuatan Pintu Dengan Metode Helgesin Birnie Kilbridge Wester, Dan Moodie Young Pada Production Training Center. Medan: Departemen Teknik Industri Universitas Sumatera Utara.
Prabowo, Rony. (2016). Penerapan Konsep Line Balancing Untuk Mencapai Efisiensi Kerja Yang Optimal Pada Setiap Stasiun Kerja Pada Pt. Hm. Sampoerna Tbk.
Rahardjo, Susilo & Gudnanto. (2011). Pemahaman Individu Teknik Non Tes. Kudus: Nora Media Enterprise
Saputra, D. P. (2014). Penetapan Standar Waktu Proses Produksi Pakaian Seragam Sekolah Menengah Atas (Studi Kasus Adiguna Tailor Dan Elwis Tailor Sebagai Objek Pembanding). 14-26.
Sutarjo, (2014). Analisis Keseimbangan Lintasan Line Produksi Drive Assy Di Pt Jideco Indonesia
Sugiyono.(2009). Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, Dan R&D. Bandung : Alfabeta.
Trenggonowaty, D. L. (2019). Mengukur Efisiensi Lintasan Dan Stasiun Kerja Menggunakan Metode Line Balancing Studi Kasus Pt. Xyz. Jurnal Industrial Servicess, 97-105.