Analysis of Construction Time Acceleration Using the Crashing Method in the North Maluku Language Office Building Construction Project

Authors

  • Landi Nasarudin Program Studi Teknik Sipil, Universitas Kahuripan, Indonesia
  • Inge Anggitasari Program Studi Teknik Sipil, Universitas Kahuripan, Indonesia
  • Olvi Pamadya Utaya Kusuma Program Studi Teknik Sipil, Universitas Kahuripan, Indonesia
  • Susilowati Program Studi Teknik Sipil, Universitas Kahuripan, Indonesia

DOI:

https://doi.org/10.55227/ijhet.v4i4.447

Keywords:

Construction Management, Critical Path Method, Project Acceleration, Project Scheduling, Time-Cost Trade-Off

Abstract

This study addresses accelerating construction time for the North Maluku Language Office Building using the crashing method. The project aims to provide adequate infrastructure to support linguistic and administrative functions, scheduled over 135 calendar days starting August 2024. Employing a descriptive quantitative design, the research involved direct field observations and Microsoft Project software to analyze critical path activities eligible for crashing. The population focused on all critical path tasks, with purposive sampling targeting those amenable to overtime acceleration. Data analysis included cost variance and percentage calculations for time reduction. Results show that applying overtime reduced the project duration from 67 days to as few as 44.67 days, with labor costs increasing between 6.7% and 26.82% depending on overtime hours. Cost and scheduling analyses facilitated selecting the most cost-effective acceleration scenario. The study concludes that the crashing method effectively balances time reduction and cost increments, serving as a practical strategy for managing delays in regional public sector projects. These findings provide critical insight for optimizing schedule compression while maintaining quality.

Downloads

Download data is not yet available.

References

Anggara, E. R., & Idi, N. (2021). Analisis Percepatan Waktu Menggunakan Metode Crashing pada Pembangunan Tower 7 Proyek Apartement Tokyo Riverside. Seminar Nasional Ketekniksipilan, Infrastruktur dan Industri Jasa Konstruksi (KIIJK), 1.

Dwiantoro, D., Yoansa, A. Y., Indrayana, D. V., Mentari, S., & Widyatami, F. S. (2024). Analisis Faktor Penyebab Keterlambatan Proyek ‘XYZ.’ Jurnal Talenta Sipil, 7(1), 388. https://doi.org/10.33087/talentasipil.v7i1.490

Kemendikdasmen. (2025, May 31). Kemendikbudristek Resmikan Gedung Kantor Bahasa Provinsi Maluku. Kementrian Pendidikan Dasar dan Menengah. Retrieved from https://staging-portal.kemdikbud.go.id/berita/4616-Kemendikbudristek-Resmikan-Gedung-Kantor-Bahasa-Provinsi-Maluku

Mahapatni, I. A. P. S. (2019). Metode Perencanaan dan Pengendalian Proyek Konstruksi. UNHI Press.

Sugiyono. (2021). [Reference details pending].

Sugiyono. (2022). [Reference details pending].

Sudaryono. (2023). [Reference details pending].

Atlan. (2024). [Reference details pending].

Emzir. (2023). [Reference details pending].

Creswell, J. W. (2018). [Reference details pending].

Sutciana, L. A., Maranatha, W., Mt, M., & Naingollan, I. (2020). Penerapan Metode Fast Track Untuk Percepatan Penjadwalan (Studi Kasus: Pembangunan Gedung Laboratorium Vokasi dan Industri Kreatif Vokasi Tahap 1 Universitas Brawijaya). Institut Teknologi Nasional

Mayaut, P. F. (2025, May 31). Kantor Bahasa Maluku bangun kantor untuk pusat konsultasi bahasa. Antara Maluku. Retrieved from https://ambon.antaranews.com/berita/159099/kantor-bahasa-maluku-bangun-kantor-untuk-pusat-konsultasi-bahasa

Downloads

Published

2025-11-22

How to Cite

Landi Nasarudin, Inge Anggitasari, Olvi Pamadya Utaya Kusuma, & Susilowati. (2025). Analysis of Construction Time Acceleration Using the Crashing Method in the North Maluku Language Office Building Construction Project. International Journal of Health Engineering and Technology, 4(4). https://doi.org/10.55227/ijhet.v4i4.447