Spatial Validation Analysis And Prediction Of Service Reach Of Trans Banyumas Purwokerto-Banyumas Corridor 4 Ahead Of Operation In January 2026

Authors

  • Dendi Putra Prakoso Universitas Amikom Purwokerto
  • Purwadi Purwadi Universitas Amikom Purwokerto

DOI:

https://doi.org/10.55227/ijhet.v4i5.525

Keywords:

Trans Banyumas, Corridor 4, Geographic Information System, QGIS, Route Validation, Service Area Analysis

Abstract

The expansion of Trans Banyumas services through Corridor 4 to the Banyumas area has entered the final stage with an operational schedule set for January 1, 2026. This study conducted a pre-operational evaluation to validate route readiness and predict service coverage using Geographic Information Systems (GIS). By modeling the route along the Bulupitu Purwokerto Terminal to Banyumas Terminal which includes 49 Bus Stops (TPB), the analysis used QGIS 3.40.11 with Network Analysis and Service Area Analysis methods. The results show that the route has high efficiency with an estimated travel time of 45-60 minutes. Service Area analysis with a radius of 400 meters confirmed that the TPB is able to cover 6 major hospitals, 8 educational institutions, and all major tourist destinations in the Old Town of Banyumas. Spatial validation concluded that the route is very feasible for operation, with high potential to support the revitalization of heritage areas and the integration of public transportation in the Greater Banyumas area

Downloads

Download data is not yet available.

References

Abu–Eisheh, S., Ghanim, M. S., & Dodeen, A. (2024). Trip generation model for a developing city in an emerging country. Transportation Research Interdisciplinary Perspectives, 24. https://doi.org/10.1016/j.trip.2024.101048

Afandi, F., Khairina, E., Dompak, T., & Negara, A. (2025). STRATEGI OPTIMALISASI PEMERINTAH INDONESIA DALAM MENINGKATKAN KUALITAS PELAYANAN TRANSPORTASI UMUM. Jurnal Progress Administrasi Publik (JPAP), 5(1), 39–45.

Faiz, A. (2022). Data Openstreetmap Untuk Memetakan Aksesibilitas Spasial dan Jangkauan Pelayanan Dasar Pendidikan dan Kesehatan di Kota Semarang. Jurnal Litbang Provinsi Jawa Tengah, 20(1), 79–96. https://doi.org/10.36762/jurnaljateng.v20i1.933

Fasya Rahmat Sanusi, A., Sugiarto Waloejo, B., & Yudono, A. (n.d.). PENERAPAN KONSEP TRANSIT ORIENTED DEVELOPMENT (TOD) DI KAWASAN MANGGARAI.

Floriantina, E. (2021). PERBANDINGAN ANTARA PRODUCTION SHARING CONTRACT COST RECOVERY DAN GROSS SPLIT DALAM USAHA HULU MINYAK DAN GAS BUMI DI INDONESIA (Vol. 9). Januari-Juni.

Hadi, W. (n.d.). STUDI DELAY TIME DAN TIME HEADWAY BUS TRANJAKARTA KORIDOR IV.

Plue, V. H. A., Da Costa, D. G. N., & Pattiraja, A. H. (2022). ANALISIS BATAS KECEPATAN PADA JALAN LOKAL SEKUNDER. Jurnal Teknik Sipil, 2(1).

Downloads

Published

2026-01-26

How to Cite

Dendi Putra Prakoso, & Purwadi Purwadi. (2026). Spatial Validation Analysis And Prediction Of Service Reach Of Trans Banyumas Purwokerto-Banyumas Corridor 4 Ahead Of Operation In January 2026. International Journal of Health Engineering and Technology, 4(5). https://doi.org/10.55227/ijhet.v4i5.525