Evaluation Of Budget Planning And Identification Of Dominant Work In The Building C Construction Project Of Husada Health College, Jombang

Main Article Content

Nicko Yoga Pratama Nicko Yoga Pratama
Inge Anggitasari
Olvi Pamadya Utaya Kusuma
Susilowati Susilowati

Abstract

Budget planning is one of the important stages in the implementation of a construction project because it is related to cost control and the feasibility of project implementation. The availability of adequate educational facilities and infrastructure is an important factor in supporting an effective and quality learning process. Along with the increasing number of students at STIKES Husada Jombang, the need for study space and supporting facilities is also increasing. Therefore, Building C STIKES Husada Jombang, which originally consisted of one floor, is planned to be renovated into two floors to meet the increasing need for space. This study aims to determine the amount of the Budget Plan (RAB) for the construction of Building C STIKES Husada Jombang and to determine the type of work that has the largest cost in the project. The method used in this study is the 2024 Work Unit Price Analysis (AHSP) published by the Ministry of Public Works and Public Housing (PUPR). The data used are in the form of working drawings which are then calculated using unit price analysis to obtain the total cost of the construction work. Based on the results of the analysis of the calculation of the volume of work and the analysis of the unit price of work, the total Budget Plan (RAB) for the construction of Building C of STIKES Husada Jombang was obtained at Rp 1,305,078,971.12. The results of the analysis show that the work on frames, doors, and windows is the work with the largest cost, namely Rp 283,155,850.00, followed by structural work of Rp 281,668,931.12

Downloads

Download data is not yet available.

Article Details

How to Cite
Nicko Yoga Pratama, N. Y. P., Inge Anggitasari, Olvi Pamadya Utaya Kusuma, & Susilowati Susilowati. (2026). Evaluation Of Budget Planning And Identification Of Dominant Work In The Building C Construction Project Of Husada Health College, Jombang. International Journal of Health Engineering and Technology, 5(2). https://doi.org/10.55227/ijhet.v5i2.886
Section
Engineering

References

Muyassaroh, D. Witri F. (2025). Budget Plan for the Construction of the Foundation for the Office Lane and Shelter at Po. Exindo 57-Jatim. Science and Engineering National Seminar 10 (SENS 10).

Putra, ECS, Nurmahmudah, F., & Baswedan, AR (2025). The Importance of Educational Facilities and Infrastructure Planning. Pedagogy Journal of Islamic Elementary School, 8, 573–584. https://doi.org/10.24256/pijies.v8i2.7549

Syaifuddin, MYM, Sulfanita, A., Didi, AB, & Muhammadiah, MJ (2026). Analysis of the Budget Plan for the Alebbong Secondary Irrigation Channel Improvement Project in Sidenreng Rappang Regency. Journal of Civil Engineering and Architecture, 31.

Yustika, NWS (2017). The Importance of Educational Facilities in Supporting the Quality of Education in Schools.