Determining Procurement Strategy Alternatives Through The Identification And Assessment Of Delay Risks In Procurement Activities For Public School Construction Projects In DKI Jakarta Province
Main Article Content
Abstract
Public school building construction projects in DKI Jakarta Province are one of the government’s strategic programs to improve the quality of educational facilities. In their implementation, the construction procurement process plays an important role in determining project success, particularly in terms of timely completion. However, various activities within the procurement process have the potential to create delay risks that may affect overall project performance. This study aims to identify activities in the construction procurement process that have the potential to cause delays and to assess delay risks based on two main dimensions, namely risk impact and likelihood of occurrence. The research method used is descriptive qualitative with a case study approach. Data collection techniques include observation, survey (Likert-scale questionnaire), document study, and archive analysis. The research respondents consist of parties directly involved in the construction procurement process. Data analysis is conducted using descriptive qualitative analysis and risk analysis to determine the level of risk for each procurement activity. The results of this study are expected to provide an overview of critical activities in the procurement process that have the potential to cause delays and serve as a basis for improving construction procurement management in public school building projects in DKI Jakarta Province. Based on the results of the risk analysis, the highest-risk factors are identified and selected, and procurement strategies are then formulated to minimize the risk of delays in public school building construction projects in DKI Jakarta Province.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
References
Azizah, L. (2022). Proses Perencanaan dan Pengendalian Pada Proses Desain di PT RE Berdasarkan PMBOK 6th Edition Berbasis Risiko untuk Meningkatkan Kinerja Kualitas.
Baily, Farmer, Jessop & Jones. (2005). Purchasing Principles and Management (9th ed.). London: Pearson Education.
Chartered Institute of Procurement & Supply. (2022). Procurement and Supply Cycle. Stamford: CIPS Publishing.
Dingbang Zhang, Hang Zhang, Tao Cheng (2020). Causes of Delay in the Construction Projects of Subway Tunnel
Ekaterina, Osipova., Per, Erik, Eriksson (2011). How procurement options influence risk management in construction projects.
Harold Kerzner. (2017). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (12th ed.). New Jersey: John Wiley & Sons.
Hayssam O. Elhusseiny, Ibrahim Nosair, A. Samer Ezeldin (2020). Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt
H D Wuala and A D Rarasati (2020). Causes of delays in construction project for developing Southeast Asia countries
International Organization for Standardization. (2018). ISO 31000:2018 Risk management—Guidelines. ISO
Iwan Kurniawan, Pungky Dharma Saputra, Safri, Ridwan Saputro (2020). Development of Delay Factor Model for Substructure Works in Building Construction
Jawad A. Alsuliman (2019). Causes of delay in Saudi public construction projects
Jainendrakumar, T. (2015). The Essence of the PMBOK (Project Management is the way of life). pmworldjurnal.
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. (2025). Konsolidasi Nomor 46 Tahun 2025 Tentang Konsolidasi Peraturan Presiden Republik Indonesia Nomor 46 Tahun 2025 Tentang Perubahan Kedua Atas Peraturan Presiden Nomor 16 Tahun 2018 Tentang Pengadaan Barang/Jasa Pemerintah. Jakarta: LKPP.
Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah. (2021). Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah Nomor 12 Tahun 2021 tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah melalui Penyedia. Jakarta: LKPP.
Masterman, J.W.E. (2002). An Introduction to Building Procurement Systems. 2nd Edition. London: Spon Press.
M. Suresh and R.B. Arun Ram Nathan. (2020). Readiness for lean procurement in construction projects.
Murat Gunduz, Nasser H. Al-naimi (2021). Studi ini bertujuan untuk memberikan cara yang tepat untuk digunakan dalam mengelola proyek secara efektif dan mengurangi risiko keterlambatan.
Mona N. Shah, Saurav Dixit, Ricken Kumar, Ratika Jain, Kunal Anand (2021). Causes of delays in slum reconstruction projects in India
Mulyani, E., & Sari, R. (2018). Analisis pemaketan pengadaan untuk efisiensi proyek pemerintah. Jurnal Administrasi Publik, 14(2), 120–134
Morledge, R., & Smith, A. J. (2013). Building procurement (2nd ed.). Wiley-Blackwell.
Nabil I. El Sawalhi and Osama El Agha (2017). Multi-Attribute Utility Theory for Selecting an Appropriate Procurement Method in the Construction Projects
Novika Candra, Yusuf Latief., Eddy Subiyanto. (2018). Pengembangan Proses Perencanaan Pada Proyek Epc Berbasis PMBOK (Project Management Body Of Knowledge) Untuk Meningkatkan Kualitas Perencanaan Proyek Yang Berkaitan Dengan Kinerja Waktu Di PT. KE
Project Management Institute. (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) (7th ed.). Pennsylvania: Project Management Institute.
Per Erik Eriksson (2024). How clients choose procurement strategies and organizational control systems in the Swedish housing sector
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.). Project Management Institute.
Pemerintah Republik Indonesia. (2025). Peraturan Presiden Republik Indonesia Nomor Nomor 46 Tahun 2025 tentang Perubahan Peraturan Presiden Nomor 12 Tahun 2021 Tentang Pengadaan Barang/Jasa Pemerintah. Republik Indonesia.
Pemerintah Republik Indonesia. (2021). Peraturan Presiden Republik Indonesia Nomor 12 Tahun 2021 tentang Perubahan atas Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah. Jakarta: Pemerintah Republik Indonesia.
Per Erik Eriksson. (2017). Procurement strategies for enhancing exploration and exploitation in construction projects
Reza Mohajeri Borje Ghaleh , Towhid Pourrostam, Naser Mansour Sharifloo , Javad Majrouhi Sardroud, Ebrahim Safa (2021). Delays in the Road Construction Projects from Risk Management Perspective
Soumi, Majumder., Soumyajit, Majumder., Debasish, Biswas (2021). Impact of effective construction planning in project performance improvement.
Sugiyono (2019). Sugiyono. Metode Penelitian Kualitatif, Kuantitatif, dan R&D. Bandung: Alfabeta.
Shehryar Idrees, Muhammad Tariq Shafiq (2021). Factors for Time and Cost Overrun in Public Projects
Usman Ismaila, Wooyong Jung, and Chan Young Park (2022). Delay Causes and Types in Nigerian Power Construction Projects.
Yusuf Lateef Oladimeji, and Folorunso Olusegun (2018). E-procurement: A Strategic Approach to Public.
Zhao, N.; Ying, F.J.; Tookey, J (2022). Construction Procurement Selection Criteria: A Review and Research Agenda